ARCHITECTURAL RECONSTRUCTIONExplore the arcade
Inspect a representative double-tier segment, not the full 959 m archwork.
Mouse: left-drag orbit, right-drag pan, wheel zoom. Touch: one-finger orbit, two-finger pan and pinch. Keyboard: arrows orbit, + / − zoom, 1 / 2 / 3 views, F fit, R reset, Esc close a marker. Focus a marker with Tab and press Enter.
GRAVITY-FLOW EXPERIMENTWater in the specus
Adjust a hypothetical rectangular channel. The results are calculated, not measured historical flows.
DISCHARGE0.0 L/s
MEAN SPEED0.00 m/s
HEAD DROP0.00 m
TRAVEL TIME0 s
A = b d · R = A / (b + 2d)
Q = (1 / n) A R2/3 √S
Assumed channel width b = 0.65 m; modelled run = 112 m
Independent arithmetic checkQ via Chezy V × A: 0.0 L/s
Difference from direct Q: 0.0000 L/s
Froude number: 0.00 (subcritical)
The channel section, roughness and selected slopes are exercise assumptions; the range is not a verified historical operating record.
EVIDENCE & LIMITS
Science & history
What is documented?
The Segovia aqueduct is a dry-jointed granite structure with a two-tier arcade. The local tourism authority reports 167 arches and a maximum height of 28.10 m. Published inventories vary slightly in total arch count, length and chronology.
What is reconstructed?
This exhibit reconstructs fourteen repeated spans of the tall arcade. Pier spacing, course layout, individual voussoir dimensions and the channel cross-section are simplified and are not a laser-scanned record. Wooden centering shown during construction is an illustrative technique documented in Roman arch-building.
What is artistic?
Granite weathering patterns, paving, distant hills, vegetation and atmospheric colours convey context; they should not be read as a surveyed ancient townscape. No invented inscriptions or figures are shown.
Physics and numerical check
A rectangular open-channel approximation uses Manning's equation Q = (1/n) A R^(2/3) √S, with area A = bd and hydraulic radius R = A/(b + 2d). Mean velocity V = Q/A; head loss over the modelled reach Δh = SL and idealised travel time t = L/V. The independent arithmetic path uses the equivalent Chezy form C = R^(1/6)/n and Q = A C √(RS), not an independent experimental measurement.
Froude number Fr = V / √(g d) with g = 9.81 m/s². Uniform steady water, roughness, level water surface across width, and a straight unobstructed channel are assumed. No structural safety analysis or actual water distribution is represented.
Sources
- UNESCO — Old Town of Segovia and its Aqueduct
- Turismo de Segovia — Aqueduct
- Turismo de Segovia — How it was made
- Spain's official tourism portal — The Aqueduct of Segovia
- ASCE — Acueducto de Segovia
Educational reconstruction; details marked as reconstruction are interpretive.