Open-channel equations
A = b × h; P = b + 2h; R = A/P; v = R^(2/3) √S / n; Q = A × v; V/day = 86,400Q.
In SI units, the channel width is 1.20 m, slope S is m/m, and n is the adjustable Manning roughness coefficient. These equations assume steady, uniform, free-surface flow; they ignore bends, deposits, leakage and transitions. The independent readout recomputes Q as A × v.
Evidence register
Documented: three tiers; six lower arches, eleven middle arches, forty-seven originally on top; overall 48.77 m height; tier lengths 142.35 m, 242.55 m and 275 m; local limestone; channel 1.2 m wide.
Scholarly reconstruction: the missing original upper arches, selected opening widths and pier spacing, complete top channel, imagined construction stages.
Artistic interpretation: individual stone hues, vegetation positions, river ripples, sky conditions and weathering. The modern hydraulics model is pedagogical.
Educational reconstruction; details marked as reconstruction are interpretive.
Sources