Arch equilibrium: H = qL² / (8f), V = qL / 2, R = √(H² + V²). In this exercise, L = 35.1 m, f ≈ 5.0 m. The central span is idealised as a parabolic, three-hinged arch under an even vertical load. The real timber system has layered beams, joints and restraints; this is not a structural-safety calculation.
Numerical check: integrate distributed load over half the arch with midpoint strips, then divide the crown moment by the rise. The calculation is independent of the closed-form expression.
River model: F = ½ρCdAv² with ρ = 1000 kg/m³, Cd = 1.2, and A = 4.6 m × selected depth. This estimates drag for a schematic pier and does not forecast actual flood conditions.
Documented: 193.3 m overall length, approximately 5 m width, 6.6 m piers, three centre arch spans (35.1 m each), two outer girder spans (34.8 m each), timber, stone, iron fittings, and historic rebuilding.
Scholarly reconstruction: layered arch ribs, timber assembly order and approximate 5 m arch rise guided by engineering studies. Artistic interpretation: exact piece spacing, wood grain, vegetation, river colour, terrain and lighting.
Educational reconstruction; details marked as reconstruction are interpretive.
Sources
- Iwakuni City — Bridge Engineering and Structural Value
- Iwakuni City — Kintaikyo Bridge Summary
- Fukuoka University — Wooden Bridge Museum: Kintai Bridge
- Ren & Koshihara (2017), A Study on the Construction History of Kintai Bridge in Japan
- Matsutsuka & Wada (2023), Study on the Arch Design of the Kintaikyo