Roof water balance
For a circular horizontal projection with radius r = 15.5 m, A = πr² gives approximately 754.77 m². Rainfall at intensity I mm/h corresponds to Qrain = I × A / 3600 litres per second because 1 mm on 1 m² is 1 litre. The illustrative runoff rate is Qrunoff = 0.82 × Qrain. The coefficient 0.82 is an assumed experiment parameter, not a measured thatch performance value.
An idealised straight roof profile, 15.4 m in vertical rise over a horizontal radius of 15.5 m, has θ = atan(15.4 / 15.5), expressed in degrees. This is an indicative slope, not a survey of the curved thatch profile. The independent check compares Qrunoff × 3600 with 0.82 × I × A in litres per hour. No water is physically stored or routed through sacred spaces.
Documentation and interpretation
Documented: 31-metre external diameter; 7.5-metre internal height; 52 woven supporting rings; organic materials, including wooden poles, palm fronds, spear grass and reeds; central role of Muzibu-Azaala-Mpanga within the Kasubi site.
Scholarly reconstruction: radial framing and generic roof layering represent published building principles rather than a timber-by-timber survey. The exterior overall height of approximately 16 metres is reported in an ICOMOS heritage newsletter.
Artistic interpretation: texture colour, weathering, simplified reeds, rain guides, surrounding vegetation and modelled construction phases. The restricted sacred interior and the royal graves are deliberately not represented.
Educational reconstruction; details marked as reconstruction are interpretive.
Sources
- Tombs of Buganda Kings at Kasubi, UNESCO World Heritage Centre — https://whc.unesco.org/en/list/1022
- Muzibu Azaala Mpanga, Kasubi Tombs site documentation — https://www.kasubitombs.org/en/description/muzibu.html
- Tombs of Buganda Kings at Kasubi: Nomination File, UNESCO — https://whc.unesco.org/uploads/nominations/1022.pdf
- Did You Know? The Tombs of Buganda Kings at Kasubi, ICOMOS Africa Newsletter (2023) — https://www.icomos.org/images/DOCUMENTS/Secretariat/2022/EPWG_Africa_Region/NL_EPWG_June_2023.pdf