Equations used
A = H(B + T) / 2 · trapezoidal cross-section area
W = ρ g A · self-weight per metre of wall
Mo = p H² / 2 · overturning moment from uniform lateral pressure
FS = (W × B / 2) / Mo · simplified overturning ratio
The model uses H = 11 m, B = 6 m, T = 3 m, an assumed granite density of 2,700 kg/m³ and g = 9.81 m/s². The independent check numerically integrates the tapered section in 500 slices.
What is documented?
- Documented: granite dry-stone construction, coursed rectangular face blocks, a perimeter of about 250–252 m, maximum wall height about 10–11 m, and a base up to about 6 m.
- Scholarly reconstruction: the broad chronology and interpretation of wall development.
- Interpretive: exact plan geometry, the displayed entrance position, internal passage dimensions, terrain dressing and the simplified cross-section.
Educational reconstruction; details marked as reconstruction are interpretive.
Sources
- UNESCO · Great Zimbabwe National Monument
- The Metropolitan Museum of Art · Great Zimbabwe
- National Museums & Monuments of Zimbabwe · Southern Region, Masvingo
- Zimbabwe Heritage · Great Zimbabwe and the Plateau States
- Webber Ndoro · The Preservation of Great Zimbabwe (ICCROM)
- Chirikure et al. · A Bayesian chronology for Great Zimbabwe