Surveying site…

DigSite Excavator & Earthworks

Foundation pit · deformable terrain · full volume accounting
AUTOPILOTStarting…Site live

Haulage fleet

Bulldozeridle
Rolleridle

Earthworks ledger

Foundation0%
Avg. depth to target0.00 / 1.60 m
Excavated0.0 m³
In transit (bucket + trucks)0.0 m³
Hauled & tipped0.0 m³
Spoil heap (measured)0.0 m³
Volume balance: 0.000 m³ error
Truck loads delivered0
Bucket cycles0
Spoil compacted0%
Site time00:00:00
Excavator fuel100%
10:30
Cab view — drag to look around

DigSite — controls

SpacePause / resume simulation
TabSwitch autopilot ↔ manual operation
1234Camera: overview / follow excavator / cab / truck
WSManual: drive excavator forward / back
ADManual: turn tracks left / right
JLManual: swing house left / right
IKManual: boom up / down
UOManual: stick out / in
NMManual: bucket curl in / dump
Shift + dragManual: horizontal = swing, vertical = boom
Ctrl/Alt + dragManual: horizontal = bucket, vertical = stick
Click terrainSet dig target (autopilot drives to it and digs)
Drag / wheel / right-dragOrbit / zoom / pan camera
B R H X FBlueprint overlay / reset site / this help / mute / refuel

Tip: dig below the strata lines to expose clay, gravel and rock. The ledger keeps every cubic metre accounted for: excavated = bucket + trucks + spoil heap. Close with H or click anywhere.