Levee section: head bands, pipe, sand boil
Head vs pipe length, flood and pipe vs time, Hc vs d70

Levee Piping Failure: Sellmeijer Critical Head and the Sand Pipe That Grows Back to the River, 2D

A river levee stands on a clay cover over a sand layer. As a flood rises, water seeps through the sand and a pipe of eroded grains can grow backwards from the sand boil at the exit toward the river. Set the peak river head, the seepage length, the thickness of the sand layer, the grain size d70, the permeability and the relative density. The critical head comes from the Sellmeijer rule (Hc = L F_R F_S F_G, as published by Deltares and USACE); the pipe grows while the river head exceeds an illustrative equilibrium head that peaks at 40 percent of the path. A finite-difference seepage solution shows the head bands and the standpipe levels. Graphs: head needed against pipe length, flood and pipe over time, critical head against grain size and against seepage length, with the Bligh L/18 line. Seven numerical checks (solver against closed-form Darcy flow and a Fourier mode, the scale factor written two ways, equilibrium length by bisection, flux conservation, step convergence); Blender levee, house, tree, standpipe and sand-boil models.

Made with 🟠 Blender