Clash (darker = more overlap) Clear (brighter = more clearance) Current routing point

BIM Clash Parameter Map: Duct & Pipe Routing Phase Space

The same axis-aligned bounding-box (AABB) clash-detection math a real BIM coordination tool runs on one candidate routing height, computed here across every candidate height at once. The horizontal axis sweeps HVAC duct height, the vertical axis sweeps plumbing pipe height, and each point is colored live by the clash scan at that exact pair β€” turning a single-snapshot 3D walkthrough into a full phase-space map you can read at a glance. Drag the point (or the sliders) to explore routing options, widen the clearance tolerance to watch the clash bands grow, and press AI Auto-Resolve to watch the same generative grid search the 3D version runs, glide visibly across the map to the nearest clash-free cell.