TBM-07 · METRODrive control · Line 7 to Central Station
0d 00:00
0/0
0 m
–
Long-section · shaft to station
FillClaySand / waterRockSettlement
Cutter change in progress
Hyperbaric intervention – cutterhead locked
Tunnel Boring Machine · Metro Drive
Drive a 6.8 m earth-pressure-balance TBM 120 m under a busy city street to Central Station. Hold the face with the right pressure, grout the tail void, steer true, and change worn disc cutters before they fail.
W / SThrust up / downE / QCutterhead RPMR / FFace pressure (green band = target for the ground)T / GTail grout pressureArrowsSteer (pitch / yaw) – mixed faces pull the shield off lineXReplace cutters (stops the drive)1 2 3 · CCameras: cutaway / tunnel / cutterheadDrag · wheelOrbit & zoom (right-drag or 2 fingers: pan)Space · Z · MPause · time scale · sound
Too little face pressure lets the ground slump – the surface (shown 25× exaggerated) sinks and damages buildings and pipes. Too much risks blow-outs. Hard rock lenses and boulders need more thrust (follow the green band on the thrust slider), wear cutters and can stall the head.
Breakthrough!
0Speed
0Safety
0Settlement
Total 0 / 100
WebGL unavailable
This simulation needs WebGL to render the 3D city and the tunnel boring machine. Please enable hardware acceleration or try a current version of Chrome, Edge, Firefox or Safari.