Command a jack-up installation vessel. Sail from port with foundations and turbine components, jack up on station, drive monopiles, erect towers, nacelles and blades with the vessel crane, lay cables and bring the farm online - all inside the weather windows.
Farm size
Weather
Controls
WSADSailing: throttle and rudder. Crane (jacked up): luff boom (W/S) and slew (A/D)RFHoist hook up / downSpaceRig / bolt-and-release loadLJLoad cargo at quay / Jack up or down on stationH (hold)Hydraulic hammerCKLay cable / Commission turbineGCrane assist (auto-slews toward the next pick or seat)TVNTime speed / Camera / Next site. Drag to orbit, wheel to zoom
Project complete
A
Operations guide
1. At the quay press L to load two turbine sets. 2. Sail to the glowing site ring and press J inside it: dynamic positioning aligns the vessel and the legs jack the hull out of the water (do this below Hs 2.5 m or the legs will slam).
3. Crane: hover the hook over the required component (marker on deck), lower, press Space to rig it, lift, and bring it onto the ghost seat. When the alignment indicator turns green and sway is low, press Space to land and bolt. Wind above the component limit forbids the lift.
4. Hold H to hammer the monopile - keep energy inside the green band. 5. After the blades, press C to lay the array cable then K to commission. 6. Jack down with J and move on. Watch the forecast: standby costs money, but storms cost more. Use T to fast-forward waiting.