Sprint 0 — press "Run Sprint"
Shipped feature block
Open bug
Debt haze
⚠ Couldn't load the 3D engineThree.js failed to load from the CDN. Check your connection and reload.
Run a software team sprint by sprint and watch delivery speed either compound or collapse depending on how it treats technical debt. Every sprint, capacity from your team size is converted into shipped story points at a rate throttled by accumulated debt; features shipped under high pressure with low quality investment add to that debt, which then divides future velocity — the same feedback loop real engineering orgs fight when "just ship it" trades short-term output for long-term slowdown. A live 3D codebase tower stacks a green block per shipped feature, a red spark per open bug, and a rising red haze for debt, while refactor investment and test-coverage discipline let you pay debt down and cut the defect rate instead.